Image Link: NNSA Home PageImage Link: About NNSAImage Link: Contact NNSAImage Link:  NNSA Sitemap
banner_nnsa.jpg
Image Link: Defense Programs Image Link: Nuclear Nonproliferation Image Link: Naval Reactors Image Link: Emergency Operations Image Link: Nuclear Security Image Link: Infrastructure and Environment Image Link:  Management and Administration
int_nnsa_nonproliferation
Printer-friendly icon Printer-Friendly 

Seversk Plutonium Production Elimination Project

The project objective, the shutdown of two weapons-grade plutonium production reactors in Seversk, was accomplished through the refurbishment of an existing fossil fuel plant. Shutdown of both reactors occurred by June 2008, earlier than scheduled. The fossil fuel plant, which provides heat and electricity to the city of Seversk, replaces the output of the two reactors. Project closeout activities will continue throughout 2009.

The existing fossil fuel plant refurbishments will improve efficiency and reliability bringing the 1950’s-era coal-fired plant to modern standards.

Plant refurbishment started in 2005 and progressed sufficiently by December 2008 to enable the Russians to shutdown both reactors, thereby eliminating Seversk weapons-grade plutonium production. This is major nonproliferation milestone.

 

Link: The White House Link: USA.gov Link: E-gov Link: Information Quality (IQ) Link: Freedom of Information Act (FOIA) Link: Privacy Program
National Nuclear Security Administration | 1000 Independence Ave., SW | Washington, DC 20585
1-800-dial-DOE | f/202-586-4403 | e/General Contact